Specifications include, but are not limited to: 1. Detail complete project schedule listing all required submittals and review times. The schedule shall also include site visits, shop inspections, installation activities, and closeout submittals.; 2. A Design Development Report and update to the Owner, Agency and the PBFAC, prior to beginning Construction Documents, along with recommended project budget. (Approximately 4 meetings).; 3. A Production Design report and meeting with the Owner, Agency, and Exhibit Designed. (Approximately 4 meetings); 4. A Building Prep Site Meeting, Preliminary and Final Shop Inspection, along with a Preliminary/Pre-Construction Installation Meeting.; Design Considerations: In planning, designing, and fabricating exhibits for the Visitor Center, the Design-Build contractor shall take into account as essential design considerations the following: Life Safety; Barrier-free design; Sustainability