Specifications include, but are not limited to: idewalk to deck connection: Using the new anchor rods placed in accordance with Special Provision EPOXY-GROUTED ANCHORS as a placement guide, set the precast sidewalk in place. Using the new anchor rods, place the lower washer and then 2 inches of thermal rubber joint sealer or an alternate joint sealer approved by the Project Manager, into the socket on top of the lower washer. Once the joint sealer is set, place the upper washer and hand tighten nut until joint is slightly compressed. Either top off with remaining joint sealer to a smooth finish, flush with top of sidewalk, or cover with a PVC cap and seal with a waterproof exterior grade caulk, approved by the Project Manager. Sidewalk to fascia beam connection: using holes in sidewalk as a guide, drill holes into the fascia beam for anchor embedment, install anchor system and threaded rod per manufacturers recommendations, see sidewalk-to-deck connection (above) for finishing assembly. Tighten diaphragm connections. Install a compression seal approved by the Project Manager at the sidewalk ends. Reconnect existing bridge rail posts and guard fence to the sidewalk and fascia beam.