Specifications include, but are not limited to: GENERAL PREPARATIONS The contractor will clean and repair the surfaces as described herein before priming, painting or staining. The contractor will scrape, clean, repair, patch and sand all windows/trim, doors/ frames and exterior building trim to attain a clean dry surface to ensure paint adhesion. Taping and masking to prevent over-spray or back-rolling onto equipment or unpainted areas. The contractor will also remove and replace damaged or cracked caulking around door and window frames as necessary and caulk areas that maybe missing caulking. The contractor shall provide all labor, equipment, materials, permits, supervision, miscellaneous supplies, incidentals, transportation and anything else required to complete the contract requirements in a timely matter. The contractor is responsible for proper disposal of all waste materials in accordance with local, state and federal regulations. STATION 12-1 MAIN BUILDING: The exterior surfaces shall be prepped for painting per manufactures recommendations.