Specifications include, but are not limited to: Hurricane Road: Spot gravel as needed from Route 114 to intersection with North and South Roads. +/- 185 CY bankrun gravel 6” depth to 415 ft. (0.26 mile), along small wetland south of Norton Pond, from on-site borrow pit. Contractor extracts and screens gravel to 6-inch minus.; Install (1) 40’X20’ parking area where kiosk exist: spread & compact 30 CY bank run gravel up to 12” depth. Contractor extracts & screens gravel 6-inch minus.; Install 4-8 large boulders to barricade two roads leading from single small field.; Install 4 large boulders to barricade road at “Mike’s Rock”.; Install 40’X20’ parking area at Ben Cole Clearing: spread & compact 30 CY bank run gravel up to 12” depth. Contractor extracts & screens gravel 6-inch minus.; Install 2 large boulders to barricade road located just south of intersection of North & South Roads.; North Road: +/- 4153 CY bank-run gravel up to 12” depth to 9345 ft. (1.77 mi.) of existing road surface from an on-site borrow pit, starting from intersection of North & South Roads to parking area at end of project route. Contractor extracts and screens gravel to 6-inch minus. Remove rocks from roadbed where needed.; Re-set bridge concrete block abutments and reinstall small bridge decking at Ben Cole Camp.; Install 40’X20’ parking area at Ben Cole Camp: spread & compact 30 CY bank run gravel up to 12” depth. Contractor extracts & screens gravel 6-inch minus. Install 2 large boulders to barricade road leading from this area.; +/- 267 CY bank-run gravel up to 24” depth to 300 ft. of existing road surface south of bridge gate from an on-site borrow pit. Contractor extracts and screens gravel to 6-inch minus. Remove rocks from roadbed where needed.; Dispose or recycle a discarded 48” metal culvert which remains on site from a bridge installation at bridge gate location.; Install 2 large boulders; 1 barricade on each side of bridge gate to prevent ATVs passing around gate.; Install (2) HDPE culverts 18” x 20’ length. Removed culverts will be disposed/recycled by contractor off-site. All culvert installations will be compacted.; Replace up to (2) culverts with HDPE 36” x 20’ length. Removed culverts will be disposed/recycled by contractor off-site. All culvert installations will be compacted.; Replace (1) culvert with HDPE 48” x 20’ length. Removed culverts will be disposed/recycled by contractor off-site. All culvert installations will be compacted.; Install 18 waterbars; OR broad-based dips armored with 3-inch depth 3-inch minus crushed stone. Waterbars must allow passage of 2-wheel drive vehicle.; Install 40’X20’ parking area on east side of existing field at terminus of project route: spread & compact 30 CY bank run gravel up to 12” depth. Contractor extracts & screens gravel 6-inch minus.; Install supplied gate to barricade road leading from this area.; West Road: +/- 2400 CY bank-run gravel up to 12” depth to 5400 ft. (1.02 mi.) of existing road surface from an on-site borrow pit, starting from intersection of the South Road to parking area at end of project route. Contractor extracts and screens gravel to 6-inch minus. Remove rocks from roadbed where needed.; Install 6 waterbars; OR broad-based dips armored with 3-inch depth 3-inch minus crushed stone.; Waterbars must allow passage of 2-wheel drive vehicle.; Clean-out 2 existing waterbars.; Install (5) HDPE culverts 18” x 20’ length. Removed culverts will be disposed/recycled by contractor off-site. All culvert installations will be compacted.; Install 40’X20’ parking area at one of two potential locations to be determined in the field: spread & compact 30 CY bank run gravel up to 12” depth. Contractor extracts & screens gravel 6-inch minus.