Specifications include, but are not limited to: 2.1. Provide a complete design including all engineering and architectural disciplines and supervision thereof to prepare construction bid documents for advertising and awarding a construction contract using West Virginia State Purchasing procedures. Key design elements include, utilizing energy efficient, economically sustainable and maintenance friendly equipment. 2.2. Designer shall be responsible for researching and investigating the location of existing utilities as applicable, and to provide drawings and specifications of any and all utilities as needed and directed by the owner and/or state agency, utility company or other utility approval authority for Kenova, West Virginia. 2.3. Drawings, specifications and cost estimates are to be submitted at 35%, 65%, 95% and 100% design milestones, cost estimates are to be revised and submitted with each submittal at 35%, 65%, 95% and 100%. 2.4. Provide construction administration and bidding services to the Owner