Specifications include, but are not limited to: The Project Overview and descriptions provided in this RFQ are intended to convey a general scope of services so that each respondent might address its experiences and present its expertise in dealing with the services requested in its SOQ. KCAB intends to utilize a combination of funding sources, including AIP entitlement and discretionary grant funding for the projects associated with this RFQ. KCAB intends to focus on the Runway 18C-36C and associated taxiway rehabilitation first. This project is currently scheduled for 2024 construction schedule. Runway 18C-36C and associated taxiways at CVG were designed and constructed to Aircraft Design Group (ADG) V design criteria at time of construction. The Boeing 747-8 (B747-8) aircraft (ADG VI) currently operates at CVG. The FAA has approved several Modification to Standards for the B747-8 operations at CVG (can be provided upon request). The selected proposed will design rehabilitation projects for the B747-8 aircraft which will require FAA coordination regarding design standards (Mod to Standards or engineering briefs). This coordination may require the selected proposed to prepare a FAA benefit cost analysis to provide justification as applicable to support the use of Mod to Standards or Engineering Brief for the B747-8 vs. ADG VI design. KCAB anticipates entering an overarching master agreement as a result of this RFQ with subsequent scope and price negotiations for each individual project.