Specifications include, but are not limited to: a. Remove and replace existing bituminous pavement along existing access road as shown on the drawings. b. Repair or replace existing stormwater drainage swales, inlet structures and piping along the access road as shown on the drawings. c. Grade and install new bituminous pavement at the visitor parking lot shown on the drawings. d. Remove, replace, and install new concrete sidewalk and curb as shown on the drawings e. Remove and replace existing concrete steps and handicap ramp at the front entrance of the Northeast Region Correctional Facility as shown on the drawings. f. Install stormwater drainage piping at the Caledonia County Work Camp Building āCā as shown on the drawings. g. Repair erosion at the drainage swale along U.S. Route 5 as shown on the drawings.