Specifications include, but are not limited to: demolition and remove a portion of the existing Married Man’s Trail boardwalk and construct a new widened boardwalk; in addition, constructing a continuous boardwalk surface along the gravel trail between the existing two boardwalk sections. This work will include new concrete footings, wood posts, beams, joists, decking and handrails; in compliance with State and Local permits and coordinating work with the Owner; 1 Mobilization 1 LS 2 Traffic Control 1 LS 3 Engineer Directed Work $20,000 CS 20,000.00 20,000.00 4 Demolition 1 LS 5 Bridge Railing (Salvage) 1 LS 6 Concrete Footings 25 EA 7 Concrete Strip Footing 1 LS 8 Timberwork (Posts) 14 EA 9 Timberwork (Beams) 12 EA 10 Timberwork (Decking) 1650 SF 11 Exit Boardwalk – Superstructure 1 LS 12 Gap Boardwalk – Superstructure 120 LF 13 Exit Boardwalk – Timber Railing 115 LF 14 Gap Boardwalk – Timber Railing 165 LF 15 Concrete Sidewalk (Panel Replacement) 89 SF 16 Concrete Retaining Wall 1 LS