Specifications include, but are not limited to: Community College of Rhode Island is seeking renovations to the first and second floors of the existing Student Services including building temporary offices in the existing Field House.; 1. Contractor shall perform the Work of the Contract under a stipulated sum Contract with the Owner in accordance with the Conditions of Contract.; 2. Vendor is responsible for obtaining and paying for any required Local and State licenses, Permits and Inspections.; 3. Contractor to include all Bond costs in their Bid.; 4. Before starting work, all Contractor workers and Subs are required to obtain and submit a current BCI and State-approved picture ID. CCRI reserves the right to deny Campus access to any worker based on information provided on the submitted BCI. All BCI's to be from Rhode Island and the Workers State of Residence and be current within six (6) calendar months of start of onsite work.; 5. All onsite workers are to be OSHA 10 certified. Copies of certifications along with driver licenses are required on the first day of work.; 6. The Contractor is responsible for all repairs to existing interior & exterior finish damages relating from this project. GC is strongly encouraged to photograph and document any damage found prior to on site activities.; 7. The Contractor is responsible for providing their workers with all personal protection equipment. at a minimum, this includes hard hats, reflective vests, eye protection, harnesses and ear protection.; 8. All completed work must be inspected and approved by College and Architect.; 9. Vendor and/or its subcontractors are to be licensed as required by RI Department of Labor.; 10. All contractors and subcontractors to sign in each employee at the CCRI Security Office located on the lower level at the start of each shift.; 11. A full time superintendant is required for the extent of construction. Selected vendor to submit resume of proposed Super and/or on site personnel for College team to review and approve. College reserves the right to reject proposed Superintendant.; 12. A full list of subcontractors to be provided as part of the submittal package at the time of tentative award.