Specifications include, but are not limited to: A successful bid shall include the following features an/or the contractor will be responsible for: • Remove and store all existing ramps. Storage area for ramps will be provided by the Parks Department. All existing ramps are to be taken apart, labeled, and stored in specified location. • Repair existing 10,800 sq ft of existing slab. • Install 5 mil vapor barrier on existing concrete slab. • Form and place concrete to create a new slab 4” thick on existing slab • Install #4 rebar on 18’ centers. Rebar to be installed on chairs to ensure the reinforcing is 2” above the existing concrete slab. • Concrete to be 3000 psi with Air Entrainment • Concrete grades will mostly follow the existing slab grades. A pre-construction meeting will be mandatory with City of Benton Admin to determine final grade. • Concrete surface to be finished to a light broom • Cut control joints will be required to create a maximum of 17’x17’ spacing • Coordination with City of Benton and ARC will be required during rebar placement to accommodate spacing to avoid interference with concrete anchors to be placed at a later date.