Specifications include, but are not limited to: Identify and repair locations of water intrusions including, but not limited to: ▪ Gold leaf dome ▪ Copper roofing ▪ Metal sheeting ▪ Clock faces • Replace, repair and re-secure wooden blockings throughout base of dome as some are missing and or will need to be repositioned or re-secured. • Scrape steel shaft cross bracing free of all loose debris. Steal shaft and cross bracing shall be repaired or replaced as necessary. Apply one full prime coat of Rustoleum primer, two full coasts of Rustoleum black satin to all steel bracing at this level. • Repair / replace louvers that are missing at bell tower level. • Evaluate wiring within bell / clock tower; ensure all installation is code compliant. (Coordinate with Inspection Services)