Specifications include, but are not limited to: Reconstruct Pedestrian Ramp on South side of Route 125/Main St at Route 24, Bowdoinham. On Route 24: Cut existing sidewalk, curb and 2’ into Route 24 23’ back from front of Route 125 curb. From East point of current D.W.F. make a mark 3’ into Route 24. Cut along Route 24 North from 2’ cut in sidewalk through the 3’ mark ending 2’ beyond Route 125 curb. Cut West from Route 24 to break in curb 6’ West of catch basin. Maintain 2’ offset around catch basin to break in curb. Remove Granite curb and old HMA. Adjust Catch Basin to grade. On Route 125 install 12’ radius Granite curb tip down (on 13’ radius). On Route 24 reset 1‐ 7.8’ section Granite curb. Install 1‐ 4.2’ straight section Granite curb and 1‐ 8’ Granite tip down both angled toward Route 24 center line enough to allow for a 6’ x 2’ diagonal Detectable Warning Field (DWF). Grade and repave 20’ x 5’ sidewalk, 8’ x 5’ area around catch basin and along both curb sections. Install 6’ x 2’ Diagonal Detectable Warning Field (DWF). Grade, Loam and seed 25’ x 2’ disturbed area.