Specifications include, but are not limited to: A. Albion Park located at 24 Berkshire Drive a. Adjust and align one double swing tubular galvanized swing gate near utility pole #2. b. Adjust and align one chain link double swing gate and install new drop rod and sleeve along first base line of baseball field. c. Remove and replace 75 linear feet of 8-foot galvanized fence fabric near first base dugout and 20 linear feet of 8 foot galvanized fence fabric on upper portion of backstop. Fabric shall be 2”, 9 gauge galvanized and have knuckled tops and bottoms. d. Remove and replace 18 linear feet of 1 5/8” rail on batting cage. e. Reattach top & bottom rails at three locations at the field. B. Lime Acres Park at located at 133 Jenckes Hill Road a. Furnish and install 72 linear feet of 6-foot galvanized chain link fence with top and bottom rail around the two existing player benches at rear softball field. Fabric shall be 2”, 9 gauge galvanized and have knuckled tops and bottoms. b. Furnish and install 100 linear feet of 8-foot galvanized chain link fence with top and bottom rail along the third base line at the front baseball field. Fabric shall be 2”, 9 gauge galvanized and have knuckled tops and bottoms. C. Fairlawn Park located at 2 Cecile Street a. Remove and replace 20 linear feet of 6-foot galvanized fence fabric on the existing backstop with 2”, 6 gauge galvanized fabric. Fabric shall have knuckled tops and bottoms. b. Retie all loose canopy fabric on backstop. c. Remove and replace 10 linear feet of 1 5/8” galvanized bottom rail on 12 foot galvanized fence along third base line.