Specifications include, but are not limited to: Provide all safety, material, labor & equipment to complete the following work Provide ground protection, pedestrian and traffic control Supply man lifts to complete work Remove all vines & vegetation Install copper rain table, all seams hand soldered. Replace counter flashing at lower rear and upper front copper roofs Pressure wash entire Bell Tower as specified in pictures Grind & tuck point open or cracked mortar joints over 1/16 of an inch (200 LF) Install new European 18oz copper half round gutters at rear lower standing seam roof; Completed with new 4” round downspouts in aluminum Remove 4 rowlocks pier caps & rebuild Replace wood and repair cupola and paint