Specifications include, but are not limited to: The primary goal of this project is to upgrade the exterior and interior quality of the fieldhouse to create a building that is cohesive with the campus aesthetic. The project includes implementing a new metal wall panel system for the entire exterior and replacement of the roof membrane. The interior of the viewing boxes has been revised to a new layout with the removal of several interior partitions as well as a new bathroom layout with all new plumbing fixtures and partitions. All exterior and interior doors will be replaced with new hollow metal and solid core doors. New flooring finishes have been added and patching of existing gypsum board surfaces. Removal and replacement of all existing casework in the concessions and viewing boxes. New mechanical, plumbing, and electrical devices will be included in this project. New prefabricated metal stairs will flank the viewing boxes in place of the current wood stairs. New metal coiling counter doors will be added to the existing concession openings. All concrete work surfaces will be ground and patched to meet current ADA standards. The stadium canopy major structural elements will be painted to add to the cohesive aesthetic. Patching a repairing of the bleacher retaining wall concrete will be included. Insulation locations must be verified and addition of insulation must be factored if there is none present in wall and roof cavities. Replacement of existing metal windows with new fiberglass windows at the viewing boxes and replacement of the drinking fountain is included.