Specifications include, but are not limited to: • Disconnect, Remove and Disposal of existing boiler, expansion tank, vent piping and decommission oil tank. • Installation of 1-High Efficiency (>95% AFUE), floor mounted propane boiler utilizing ECM circulator pump(s) and air/dirt separators in the original location. • Boiler mounting rack. • Low water cutoff safeties. • Install venting and fresh air piping from boiler to the outside of building. • Install a new potable water storage tank (40 Gallon New Indirect-WaterHeater) • Connect new boiler to all other existing and relevant systems o Reconnect all water piping from new boiler to existing duct work/piping. o Install gas piping from new propane tank location to the new boiler. • Provide electrician to reconnect high and low voltage wiring. • Preform factory start up and programming of system with manufacturing representative and check controls for safe and proper installation.