Specifications include, but are not limited to: 1. Project involves replacement of existing synthetic surfacing at the designated school. Scope includes removal of existing synthetic surfacing to the existing asphalt base, preparation of base, and installation of new synthetic surfacing. Synthetic surfaces at the school are comprised of a six-lane running track, high jump, long / triple jump, and other field event areas. 2. Provide all synthetic track surfacing components, finishes, and other accessories as described in Contract Documents and as recommended by the synthetic track surfacing manufacturer to construct a complete system. All Work shall be performed in compliance with Manufacturer’s recommendations for the site location and base surface conditions. 3. Project will be constructed under a single prime contract.