Specifications include, but are not limited to: PREPARATORY WORK, SUCH AS CLIPPING THE GRASS AND DEBRIS FROM THE EDGE OF THE EXISTING ROADWAY, WILL NOT BE PAID FOR DIRECTLY, BUT WILL BE CONSIDERED A PART OF THE OTHER ITEMS OF WORK. AFTER THE ROADWAY IS COMPLETED, THIS MATERIAL SHALL BE PULLED UP TO THE EDGE OF THE NEW PAVEMENT AT LOCATIONS WHERE THE DROP OFF IS GREATER THAN 4" RESULTING FROM THE TRANSITIONS OR GUARDRAIL ROADWAY IMPROVEMENTS. NO DIRECT PAYMENT WILL BE MADE FOR THIS WORK. 6. ASPHALT DEBRIS RESULTING FROM THE PREPARAORY WORK SHALL BE REMOVED FROM THE PROJECT. THIS MATERIAL SHALL NOT BE BURIED OR STOCKPILED WITHIN THE RIGHT OF WAY. 7. ALL FLEXIBLE BASE AND ASPHALTIC PAVEMENTS REMOVED SHALL BE PAID FOR UNDER THE ITEM NO. 210 - UNCLASSIFIED EXCAVATION.