Specifications include, but are not limited to: The Scope of Work will generally include, but not be limited to installing gabion retaining walls along the west streambank, from approximately sixty-five (65) feet upstream of the bridge to the bridge, and approximately thirty (30) feet starting at the bridge running downstream. Wingwalls will be installed around the western bridge abutment. Additionally, approximately sixty hundred fifty (650) feet of eight (8) foot wide concrete trail will be constructed west of the existing trail currently at risk of being undermined by the streambank erosion downstream of the bridge, and the reach of trail it replaces will be demolished and removed from the site. The awarded Bidder will be responsible for 100% completion of the work, inclusive of but not limited to the furnishing of all labor, materials, tools, equipment, demolition, disposal, transportation, insurance, profit, and all other necessary components to perform the work as specified.