Specifications include, but are not limited to: Repair traffic signals in Concord and replace Weigh-in-Motion Station in Rochester; Replace Signal Equipment Damaged by Motor Vehicle Crash ; Replace Signal Equipment Damaged by Motor Vehicle Crash FE Everett and Spaulding Tpke; US Route 1; NH Route 3A CONCORD/ROCHESTER 43762 Concord - Turnpike R&R 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 5.00 616.19102 ALTERATIONS TO TRAFFIC SIGNALS U 1.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 7,500.00 618.7 FLAGGERS HR 80.00 619.1 MAINTENANCE OF TRAFFIC U 0.22 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 135.00 677.6213 GENERATOR BACKUP SYSTEM, PROPANE SMALL U 1.00 692. MOBILIZATION U 0.22 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $ 4,000.00 1010.15 FUEL ADJUSTMENT $ 2,290.19