Specifications include, but are not limited to: 4.1.1 Contractor is responsible for daily clean up and removal of refuse from areas of work. All refuse will be transported in covered containers through the facility. Caution tape shall be used to identify areas outside the building that are under construction.; 4.1.2 Contractor will furnish and install proper floor and wall protection for existing finishes, paint per the Bid Document Drawings.; 4.1.3 Contractor will provide a dumpster for project.; 4.1.4 Contractor is responsible for all area containment, and negative air filtration systems (if required) for the scope of work.; 4.1.5 All workers assigned to work at UMC must provide proof of negative TB testing results. Covid vaccinations are required. Flu vaccinations are highly encouraged. Any Workers without a flu vaccination will be required to follow standard Infection Control policy of wearing a mask while working at UMC property.; 4.1.6 Contractor will provide a copy of their current Safety Manual to UMC Safety Department.; 4.1.7 Contractor will follow and be compliant with Infection Control permit requirements if deemed necessary.; 4.1.8 Contractor will follow and be compliant with any Interim Life Safety Management plans when deemed necessary.; 4.1.9 Contractor will secure all HVAC ducting when performance of work creates dust or smoke particulates as necessary to prevent contamination of existing duct systems.; 4.1.10 All personnel must wear a badge issued by the Engineering Department/Plant Operations at all times while on campus.; 4.1.12 Provide all management, supervision, labor, material, tools, equipment and disposal containers to complete the entire project.; 4.1.13 Provide all material, equipment, tools and labor to establish and maintain any/all required temporary containment areas and negative air ventilation (to the outside or as directed) systems.; 4.1.14 Contractor is responsible for sealing of all penetrations disturbed or created in performance of contract covered work. UL penetration details will be provided by contractor and followed when performing this work. No mixing of sealant types is allowed in any penetration location