Specifications include, but are not limited to: The improvements consist of furnishing all labor and materials for the proposed improvements to include widening SR 72 from one lane in each direction to two lanes in each direction. The project will add a two-way left turn lane. The project will also include the addition of bike lanes and sidewalks. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer.; INLET SEDIMENT CONTROL, CULVERT INLET, QTY EACH 10; WELL POINT SYSTEM, QTY EACH 6; COMPOST FILTER LOGS, QTY LF 582; TOPSOIL, 6" DEPTH, QTY SY 82138; ADJUST OR REPAIR EXISTING CONDUIT JUNCTION WELL, QTY EACH 2; DETECTABLE WARNING SURFACE, QTY SF 980; PEDESTRIAN CONNECTION, TYPE 2, 3, AND/OR 4, QTY SF 2181; PEDESTRIAN CONNECTION, QTY SF 1069; RIPRAP, R-4, QTY SY 530; RIPRAP, R-5, QTY SY 26; CHANNEL BED FILL, QTY CY 100; CONDUIT JUNCTION WELL, TYPE 7, 36" X 60" PRECAST POLYMER CONCRETE, QTY EACH 6; GEOTEXTILES, SEPARATION, QTY SY 1865; UNDERDRAIN OUTLET PIPE, 6", QTY LF 304; GEOTEXTILES, RIPRAP, QTY SY 494; UNDERDRAIN OUTLET, QTY EACH 11; ADJUST WATER VALVE BOXES, QTY EACH 20; TEMPORARY CONSTRUCTION FENCE, QTY LF 1030; PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT, QTY SYIN 45253; SAW CUTTING, BITUMINOUS CONCRETE, QTY LF 6359; PERFORATED PIPE UNDERDRAINS, 6", QTY LF 12120; SAW CUTTING, CONCRETE, FULL DEPTH, QTY LF 2887; CONSTRUCTION ENGINEERING, QTY LS 1; TRAINEE, QTY HOUR 1800; CURB OPENING, 4' OPENING, QTY EACH 24; UTILITY CONSTRUCTION ENGINEERING, QTY HOUR 50; FIELD OFFICE, SPECIAL I, QTY EAMO 25; ARROW PANELS TYPE C, QTY EADY 71; PROVIDE AND MAINTAIN PORTABLE CHANGEABLE MESSAGE SIGN, QTY EADY 1803