Specifications include, but are not limited to: Selective demolition of the existing concrete spillways, aprons and wing walls, dewater remaining impoundment, regrade banks and reseed site. Site work will require clearing and gravel road improvements, minor traffic control, concrete demolition and disposal and site restoration work; 1-Mobilizaton/Demobilization 1 LS 2-Dam Demolition 1 LS Estimated contract quantity 195 CYD of concrete. 3-Dam Material Disposal 1 LS Estimated contract quantity of 195 TONS of Dam Material Disposal 4-Embankment Excavation 1 LS Estimated Quantity of 345 CYD of embankment excavation 5-Excavation Material Disposal 1 LS Estimated Quantity of 345 CYD of excavation material disposal. 6-Fine Grading with Equipment 1 LS Estimated Quantity of 200 SYD of fine grading with equipment. 7-Silt Fence 300 LFT 8-Erosion Control Blanket 500 SYD 9-Topsoil and seed impacted uplands 1 LS Estimated contract quantity of 0.3 AC 10-Traffic Control Signage 4 EA 11-Vehicle Barricades/Barrels 4 EA 12-Remove Brush from Access 1 LS Estimated contract quantity of 0.3 AC for brush clearing. 13-Gravel for Access Road 300 CYD 14-Restore Dilley Road 1 LS 15-Flow Management 1 LS