Specifications include, but are not limited to: Project consists of a new 5,000 square foot pre-engineered metal building with evidence storage, fitness space, and support facilities. The pre-engineered metal building is owner provided, however the erection and related work shall be included herein as part of the overall project.; 12” Diameter ADS N-12 Piping, Installed l.f.; 15” Diameter ADS N-12 Piping, Installed l.f.; Standard Asphalt Paving s.y.; Gravel Lot s.y.; Concrete Sidewalk s.f.; Concrete Curb & 12” Gutter l.f.; Concrete Header Curb l.f.; 6” Slab On Grade with Vapor Barrier s.f.; 4” Slab On Grade with Vapor Barrier s.f.; 8” CMU Wall with Reinforcing s.f.; 3 5/8” Metal Stud Wall with Painted Gypsum Board, Both Sides s.f.; Athletic Flooring s.f.; Rubber Base l.f.; Sealed Concrete s.f.; Hollow Metal Door & Frame Each; Metal Liner Panel s.f.; Paint (Primer & Finish Coats) s.f; Wall Mount Occupancy Sensor Each; Ceiling Mount Occupancy Sensor Each; Single Pole Light Switch Each; Single Pole Low Voltage Light Switch Each; 3-Way Light Switch Each; Metal Single Gang Box Each; Metal Two Gang Box Each; Duplex Receptacle with conduit & wiring Each; Quadplex Receptacle with conduit & wiring Each; GFCI Receptacle with conduit and wiring Each; Weatherproof GFCI Receptacle with conduit and wiring Each; Data/Voice box with CAT6 cable Each; LED High-Bay light fixture Each; Exit Sign Each; Motor Connection Each; 30A Single-Phase Disconnect, Installed Each; 30A Three-Phase Disconnect, Installed Each; 3/4” EMT Conduit, Installed l.f.; 1” EMT Conduit, Installed l.f.; 1 ½” EMT Conduit, Installed l.f.; 2” EMT Conduit, Installed l.f.; 3” EMT Conduit, Installed l.f.; ¾” PVC Conduit, Buried l.f.; 1½” PVC Conduit, Buried l.f; (3) #12 Type THWN Conductor l.f.; (3) #10 Type THWN Conductor l.f.; 20A One Pole Breaker Each; 20A Two Pole Breaker Each; Emergency Light Fixture Each; Voice Outlet Back Box with Conduit and pull string to above Ceiling Each; Data Outlet Back Box with Conduit and pull string to above Ceiling Each; Wireless Access Back Box with Conduit and Pull String to IT Rack Each; Condensate Line and Insulation l.f.; Hose Bibb, Installed Each