Specifications include, but are not limited to: 1. Preliminary design, final design, and cost estimates for transmission main replacements projects 1 and 2 as identified in the Downtown Corridor Water System Facility Planning Study. Incorporate completed plans and specifications for Main Street 9th St to Jefferson St and Main Street 18th St to US-12 (21st St). Conceptual design and cost estimates for transmission main replacements from WTP to Low and High Reservoirs.; 2. Final bid documents and bid assistance for transmission main replacement projects 1 and 2 as recommended in the Downtown Corridor Water System Facility Planning Study.; 3. Construction engineering and inspection services for transmission main replacement projects 1 and 2 as recommended in the Downtown Corridor Water System Facility Planning Study.; 4. Preliminary design, final design and cost estimate for transmission main replacements from WTP to Low and High Reservoirs.; 5. Final bid documents and bid assistance for transmission main replacements from WTP to Low and High Reservoirs.; 6. Construction engineering and inspection services for transmission main replacements from WTP to Low and High Reservoirs; A. Ability to design replacement water transmission mains.; B. Ability to design underground infrastructure in a commercial corridor.; C. Ability to complete hydraulic analysis for water transmission main alternative designs and construction sequencing.; D. Ability to implement the analysis, concept, and final design work completed by others into a comprehensive project.; E. Ability to complete all project phases professionally and on schedule.; F. Ability to perform construction management and inspection during the project.; G. Ability to deliver and present updates to City Council and Staff.; H. Ability to integrate all needed policies, procedures and reporting requirements of the City, federal ARPA funding, and any other funding sources.