Specifications include, but are not limited to: The Bristol Avenue Reconstruction includes a 0.66-mile section of Bristol Avenue (CR 8) from Brown Street to Powell Drive. The scope of the work includes reconstruction of the 2-lane roadway, curb and gutter, storm sewer, multi-use path construction, and replacement of impacted Town utilities that include sanitary sewer, lift station and water main. In addition, the project will include sight-line improvements at intersections and along the roadway, evaluation of intersection controls, and turn lanes on Hemsbred Street. The proposed multi-use path connects to the Pumpkinvine Nature Trail and will be the first section of the Quaker Trace Trail system to connect our residential subdivisions along the corridor and allows for future extension to connect Middlebury to Bonneyville Mill Park and eventually to the Town of Bristol.