Specifications include, but are not limited to: a. Trash and Refuse Removal. All common area interior and exterior trash receptacles shall be emptied daily and returned to their initial locations. Boxes and papers placed near a trash receptacle and marked “TRASH” shall be removed. All can liners obviously soiled or torn shall be replaced. The Contractor is responsible for removing trash and debris from buildings. Trash shall be disposed of in secured plastic bags in the nearest outside 19 dumpster. The Contractor shall pick up any trash that may have fallen onto the facilities grounds during removal from the building. The State will be responsible for emptying of the dumpsters. Trash shall not be left in custodial closets or other areas overnight. The Contractor is responsible for removing stains and spots on surfaces where trash is placed before transportation to refuse dumpsters. These surfaces include carpet, tile, and concrete surfaces. b. Vacuuming. Vacuuming will be performed once a week with an electric stand up or handheld vacuum. All common area carpeted areas are to be thoroughly cleaned. This includes under desks and tables, behind doors and in corners. Upon completion, all carpeted areas shall be neat, clean, free of debris, and have a professional appearance. All tears, burns, and raveling will be brought to the attention of the State Project Manager.