Specifications include, but are not limited to: Consisting of approximately 34,700 C.Y. of Excavation; 59,000 Tons of Classified Fill and Backfill; 6,763 L.F. of Curb and Gutter Removal; 17,899 S.Y. of Pavement Removal; 2,091 Tons A.C. Pavement; 6,707 L.F. Curb and Gutter Installation; 11 Curb Ramp Installations; 159,440 S.F. Insulation Installation (R-9); 11,470 S.F. Insulation Installation (R-4.5); 1,787 S.Y. P.C.C. Sidewalk (6-inch Thick); 150 L.F. of Culvert Pipe; 3,349 LF of Subdrain Pipe; 112 Footing Drain Services; 26 Storm Drain Manholes (various types); 28 Storm Drain Catch Basins; Creek Channel Reconstruction; 22 Roadway Luminaires; 2 Type 1A Load Centers; 385 L.F. Heat Trace; Landscaping and related work.