Specifications include, but are not limited to: THIS PROJECT CONSISTS OF 12.4 MILES OF PAVEMENT RESURFACING ON A SECTION OF I-93 IN MANCHESTER AND HOOKSETT IN DISTRICT 5. 202.7 REMOVAL OF GUARDRAIL LF 15,419.00 203.1 COMMON EXCAVATION CY 100.00 203.5561 EAGRT PLATFORM PREFERRED U 12.00 203.5596 GUARDRAIL E-2 PLATFORM LF 379.00 206.1 COMMON STRUCTURE EXCAVATION CY 15.40 304.301 CRUSHED GRAVEL CY 10.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 2,000.00 403.11823 HBP-3/4" BINDER MIX, MACHINE METHOD, POLYMER MODIFIED TON 1,825.80 403.11842 HBP-1/2" SURFACE MIX, MACHINE METHOD, POLYMER MODIFIED, QC/QA TIER 2 TON 5,121.00 403.12 HBP-HAND METHOD TON 50.00 403.16 PAVEMENT JOINT ADHESIVE LF 70,287.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 12,955.10 410.22 ASPHALT EMULSION FOR TACK COAT GAL 6,111.00 410.752 EMULSIFIED ASPHALT FOG SEAL GAL 10,364.00 410.753 COVER AGGREGATE TON 25.90