Specifications include, but are not limited to: General Work—Residential Units • Replace interior drywall as needed after completion of hazardous materials survey; • Remove tile/mastic and install new VCT planks throughout units; • Install wood baseboard or contour rubber vinyl base; • Remove HVAC unit screens if mini-split system used; • Repair CMU/stucco exterior walls as required; prime and paint entire buildings; • Provide R-30 insulation at ceilings to provide energy savings; provide adequate roof ventilation; • Install new hardwood kitchen cabinets and new countertops; General Work—Community Building • Upgrade Community Center/Management/Maintenance Office Building as required: • Replace HVAC units on Community Center; • Upgrade heating and cooling system in shop building; • Re-design Community Center to include a library, computer area, and exercise/weight room; • Upgrade lighting throughout.