Specifications include, but are not limited to: 2.1. Current Plant Flow is 2.40 million gallons/day with a sludge generation of approximately 640 dry tons/year and estimated for Fiscal Year July 2021 thru June 2022 approximately 2.70 million gallons of sludge (Gal. Multiplier in BP-3 derived from statistical data in 3.3 under referenced fiscal year above, multiply monthly average by 12). There is no guarantee of sludge quantities. Sludge currently disposed at The Mattabasset District Water Pollution Control Facility, Cromwell, CT. 2.2. Bidder shall provide equipment, labor and all insurance coverages required to provide transportation with disposal of sludge generated at the Septage Treatment Facility. In addition, backup capabilities to cover equipment or labor shortages. 2.3. Sludge generated is primarily from domestic sources with light industrial waste. 2.4. Work performed shall include transportation, processing and disposal and shall be in compliance with all latest local, state and federal regulations. 2.5. Bids shall be reviewed by Town Staff, Water Pollution Control Authority, and may include a visit to the Bidder’s Disposal Sites.