Specifications include, but are not limited to: The project generally includes the construction of roadway widening, curbs, sidewalks, traffic signals, signage and pavement markings and related work. Estimated quantities are as follows: 2.01 SITE PREPARATION 1 L.S. 3.02 SELECT FILL 148 C.Y. 4.01 AGGREGATE BASE COURSE 211 TON 5.01 TACK COAT 97 GAL 6.01 ACHM SURFACE COURSE 503 TON 7.06 CONCRETE DRIVEWAY (6" THICK), STANDARD FINISH 502 S.F. 8.03 CONCRETE CURB & GUTTER (CLASS 3) 419 L.F. 9.04 CONCRETE SIDEWALK (4" THICK) 1341 S.F. 10.04 CURB INLET - 4' BOX 3 EA 10.07 WING 3' EXTENSION 4 EA 11.06 REINFORCED CONCRETE HEADWALL 3 C.Y. 13.18P STORM DRAIN PIPE, 18" SIDE DRAIN 72 L.F. 14.01 SOLID SODDING (BERMUDA) 818 S.Y. 16.01 MAINTENANCE OF TRAFFIC 1 L.S. 18.55 WATER FOR DUST CONTROL 20000 GAL 19.01 CLEAN UP 1 L.S. 24.02 CHECK DAM (CD) 1 C.Y. 24.06 SEDIMENT BARRIER, SILT FENCE (SD1) 3 EA 24.09 SEDIMENT BARRIER, BLOCK (SD4) 3 EA 24.11 SILT FENCE - TYPE A (SFA) 496 L.F. 26.10 TRENCH & EXCAVATION SAFETY 1 L.S. 27.10 COLD MILLING ASPHALT PAVEMENT 289 SY 28.01 GUARD RAIL 101 L.F. 205.00 REMOVAL OF EXISTING BRIDGE STRUCTURE 1 L.S. 309.06 PORTLAND CEMENT CONCRETE BASE (8" U.T.) 294 S.Y.