Specifications include, but are not limited to: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. 1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 The following design services will be needed: 1.3.5.1 Design professional shall review condition of existing roof, precast joints, louvers, flashing, equipment curbs and other construction details to design repairs or replacement as needed. 1.3.5.2 Designer shall include mechanical and electrical engineer review as there is significant ductwork and electrical installed on the existing roof that will need to be kept functioning and work around during re-roof activities. 1.3.5.3 Designer shall include an acoustical review to ensure any changes to the roof do not compromise the soundproofing of the recording studios and other sensitive areas. 1.3.5.4 Designer shall include relocation of one existing roof ladder and a review of options for roof fall protection. 1.3.5.5 Designer shall include material recommendation(s) for repainting the building exterior. 1.3.5.6 It is expected several alternates may be needed for the exterior repainting and caulking replacement budgetary purposes. 1.3.6 Existing PDF drawings will be provided to the successful design firm. Accuracy of drawings shall be verified by the design firm. 1.3.7 Field examination of the existing buildings. 1.3.8 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include non-proprietary equipment and systems. 1.3.9 Provide minor drawing work to assist the Construction Manager in the development of hazardous materials bid package, if needed. This shall include providing PDF backgrounds for identification, by others, of hazardous materials removal. DAS will contract independently for hazardous material testing once the full construction scope has been defined. 1.3.10 Designer shall include any and all survey work required for completion of project. 1.3.11 Coordinate with State agencies to confirm utilities that may be abandoned as well as shut down requirements where required. 1.3.12 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule. 1.3.13 Designer shall assist Construction Manager in the evaluation of long lead times. 1.3.14 Quality control during Design, Preconstruction and Construction. 1.3.15 Compliance with all Federal, State, and applicable Local codes. 1.3.16 Completion of State building and energy code documents, as required.