Specifications include, but are not limited to: Installation of a new mechanically cleaned fine screen, including construction of an addition on the existing Secondary Control Building. Replacement of three existing influent pumps. Refurbishment of the existing grit removal system. Replacement of one existing oxidation ditch rotor and drive. Refurbishment of two existing secondary clarifiers and construction of one new secondary clarifier to include construction of a new flow distribution box, sludge pumping vault, and sitework necessary to connect the new secondary clarifier to the existing yard piping. Construction of approximately 40 linear feet of new effluent line connecting the secondary clarifiers to the existing chlorine contact tank, improvements to the chlorination/dechlorination building, general site repairs/refurbishments, installation of new electric service to the facility and conversion from 230 V to 460 V power for select process equipment.