Specifications include, but are not limited to: Contractor required to supply all materials, labor and equipment necessary for the relocation of generator at old Dubuque garage to the Urbana garage. Project includes the disconnection and labeling of unit from the Dubuque site, transportation to DOT Urbana Maintenance Facility site. Site prep of a new concrete pad and installation of new conduit Disconnection of existing smaller generator at the Urbana garage and reconnecting Dubuque unit to Urbana location. New connect to include connecting the brine building to the emergency generator. The brine building has never been connected to an emergency power device. Sizing of wire, breakers, disconnects switches and switch gear and conduit is to be as per electrical code.