Specifications include, but are not limited to: Material - Will be furnished and delivered utilizing tri-axle dump trucks to various locations predominantly in Norwich. Exact Locations ll be determined at the time materials are ordered, in full truckload as required. Truck beds must be clean. Delivery by roll-off / dump trailers are prohibited. Upon notice deliveries must be made within 24 hours. Inspection of material will be done before awarding bid. Material Specifications (Reference CT DOT Form 817) Pipe Bedding Sand M.08.03-2 Sand (M03.01-2 Fine Aggregate) Processed Gravel M.05.01 Screened Loam M.13.01 - Topsoil Bank Run Gravel M.02.06-1 Grading “B” ¾” Crushed Stone M01.01, Size 6 2” Crushed Stone M01.01, Size 3 Modified Rip Rap M.12.03