Specifications include, but are not limited to: Provide all labor, materials, equipment, traffic control and incidentals necessary to apply epoxy pavement markings per contract information. Contractor shall replace the existing stripes in kind unless otherwise directed by the Maintenance Chief. Where centerline rumble strips are present, the surface of the rumble strip will have a grind per Table 1, Section 1.0. Contract Information. The bottom portion of the rumble strip will be cleaned, dry, and free of debris prior to striping application. Contractor will not be allowed to use water blasting to clean. 4” Stripe – White Gallon 4,984.0 4” Stripe – Yellow Gallon 2,059.0 Symbols/Words S.F. 18,746.0 Yellow Curb Marking L.F. 1,580.0