Specifications include, but are not limited to: installation, operation and maintenanceas necessary to furnish and install DCFC charging stations per the quantities and locationsdescribed herein. More specifically this includes, but may not necessarily be limited to: •Design and preparation of plans and specifications for the proposed location(s) perCITY standards;•Coordination with all applicable agencies to obtain necessary permits;•Coordination with Avista Utilities on any new power feeds, transformer and meterinstallations required;•Ensuring all work is conducted by contractors holding all necessary State of Idaholicenses as public works contractors qualified for the work necessary for theinstallation of the EV charging stations;•Securing and complying with CITY encroachment and building and/or electricalpermits necessary for the EV charging station installations;•Installation of electrical conduits and electric connection to supply power forthe complete installation and operation of the EV chargers;•Furnishing EV charger material and equipment for a complete in‐place system.