Specifications include, but are not limited to: The Work is summarized as construction of interior renovations at IDO building as noted in the drawings. The space allocated for the building standards group is approximately 5,000 sq/ft and will include: reception area (adjacent to the main lobby), collaboration space, huddle room, storage space, IDF closet, coffee/break niche, copy/plot space, 3 private offices, 4 high wall cubicles, 30 low wall cubicles and 2 hoteling desks. The buildout will utilize existing building standards as selected in the current building design for lighting, HVAC, Telecom and Security.; 1. Scope of work requires the installer to access into the work area through the existing glazing by providing openings that meeting safety requirements.; 2. It is the contractor’s responsibility to coordinate noise level during the construction. Work lower than 50 dB level is allowed during work hours. Any construction above this dB level shall be completed after hours or coordinated with owner in 72 hours in advance.; 3. Work needing utility shut-offs shall be completed after hours with 72 hours notification. Major shut-offs shall be done on Friday to allow time for repairs.; 4. A lay-down area outside the IDO building will be identified next to the construction zone. It is the contractor’s responsibility to provide closures that meet security requirements for the lay-down area and construction zone.; 5. Existing doors to the construction zone will be temporarily boarded up to secure the office spaces. Any work to the doors will be conducted after the glazing is reinstalled. Glazing work will be performed by Southwest Glass to maintain its remaining warranty.; 6. Any work that may impact ongoing operations to be coordinated in advance with HAS project team.; 7. Firetrol will be required to be on site for any modifications to the HAS fire suppression systems.; 8. The successful bidder will have access to any drawings that HAS might have on file.