Specifications include, but are not limited to: complete and replace the heating and a/c system in building; including removal of old units This building is unique as it is storage for artifacts for the museum. Therefore one of the areas must have a specific temperature and humidity controlled environment. A Liebert Thermal Management Unit will be installed for that area. Contractor must work closely with museum staff to ensure artifacts are moved out of the way as needed. The following is a breakdown for the units requested: Unit #1 – 3.5 ton Trane 14.0 seer a/c electric; Horizontal application; equipment to be 208/230 volt three phase Unit #2 – Liebert System – 1 ton Liebert MiniMate2 model MMD12ENPJS0N environmental control system. Includes a wall mounted microprocessor, SCR reheat, steam generating humidifier, filter box, remote temperature and humidity sensor, hot gas bypass capacity control, disconnect switch one evaporator unit and all other materials needed to do a turnkey HVAC job. Equipment to be 208/230 volt single phase Unit #3 – 5 ton Trane 14.0 seer a/c electric; Horizontal application; equipment to be 208/230 volt three phase Unit #4 – 4 ton Trane 14.0 seer a/c electric; ; Horizontal application; equipment to be 208/230 volt three phase Unit #5 – 5 ton Trane 14.0 seer a/c electric; Horizontal application; equipment to be 208/230 volt three phase Unit #6 – 4 ton Trane 14.9 seer a/c electric; Horizontal application; equipment to be 208/230 volt three phase Contractor must provide a 15-ton boom truck crane for project