Specifications include, but are not limited to: Qualified contractors to upgrade and improve the drainage along 3,275 linear feet of Emswiler Drive and Sunday Drive. This project will involve, but is not limited to, clearing, grubbing, excavation, import and placement of borrow material, import and placement of aggregate base and surface courses, placing hot mix asphalt, installing drainage culverts and placing topsoil and seed. • Supply labor, equipment, materials and supplies to perform the required work as shown on the construction plans for MSB project number 21-20-0906. • Contractor is to provide resources to complete this project without any adjustments in the original bid amount or contract time. • Contractor is required to obtain an ADEC APDES permit prior to utility relocation activities. Utility relocation work done by the utility companies will be performed under this permit. • Contractor shall complete ROW and utility easement staking and clearing and all necessary SWPPP items for utility relocation support upon NTP. This work shall be included in items 201(3B), 642(1), 641(1), and 641(3). Additional stump removal for utility support will be directed if needed and is not included in these items. The anticipated additional utility support areas are as follows: o STA 10+00 to 14+00 LT o STA 15+50 to 25+60 LT o STA 26+15 to 37+00 LT o STA 37+00 to 37+20 RT