Specifications include, but are not limited to: The Contractor will open all lanes to unimpeded traffic and the Department will not allow work on SD 87 and US 16A from June 24, 2016 to August 14, 2016 (inclusive). The Contractor will not expose traffic to differential elevations in traveling lanes due to milling or paving operations during this timeframe. The Department will not allow milled surfaces, grooved surfaces, uneven lanes, unmarked lanes, or shoulder drop offs during this timeframe. The Contractor will pave all transitions for a smooth ride as approved by the Engineer. In addition, if the Contractor begins the asphalt overlay work on SD 87 and US 16A, the Contractor will complete all permanent pavement markings on all disturbed portions of SD 87 and US 16A