Specifications include, but are not limited to: The contractor shall maintain a minimum one 11’ lane of alternating traffic on County road. Single lane closures of I95 NB and SB shall only be allowed from 8:00 PM to 6:00 AM for nights when the contractor is installing and removing containment. No nighttime lane closures shall be allowed on Friday nights on I95.; The contractor shall maintain a minimum two 11’ lanes of traffic on Quarry road. Single lane closures of I95 NB and SB shall only be allowed from 8:00 PM to 6:00 AM for nights when the contractor is installing and removing containment. No nighttime lane closures shall be allowed on Friday nights on I95.; No lane closures shall be allowed on Main Street from 6:00 AM to 8:00 PM. The contractor shall maintain a minimum two 11’ lanes of traffic on main street from 8:00 PM to 6:00 AM. Single lane closures of I95 NB and SB shall only be allowed from 8:00 PM to 6:00 AM for nights when the contractor is installing and removing containment. No nighttime lane closures shall be allowed on Friday nights on I95 or Main Street. Main Street under clearance can be reduce by 1 foot to 13’ 1” signs will be required to warn of reduced under clearance, Bridge Maintenance and the 511 system will need to be updated as well.; On other final pavement markings and on curb, where the paint is applied by hand painting or spraying, application shall be one uniform covering coat at least 16 mils thick. Before the paint has dried, the glass beads shall be applied by a pressure system that will force the glass beads onto the undried paint as uniformly as possible. ; Painted lines and markings shall be applied in accordance with the manufacturer’s published recommendations. These recommendations will be supplied to the Resident prior to installation.