Specifications include, but are not limited to: Qualified engineering firms to perform preliminary and design engineering and affiliated services to complete the following project. Structure #34-101-05.1 is located 2 miles North and 1 mile West of Walhalla, ND on 127th Ave. NE. Structure #34-105-21.2 is located 1 mile East and 1 mile North of Mountain, ND on 130th Ave. NE. Structure #34-105-21.3 is located 1 mile East and 1 mile North of Mountain, ND on 89th St. NE. Structure #34-105-29.0 is located 1 mile East of Gardar, ND on 130th Ave. NE. Structure #34-106-21.0 is located 2 miles East and 1 mile North of Mountain, ND on 131st Ave. NE. Structure #34-106-23.1 is located 2 miles East of Mountain, ND on 131st Ave. NE. Structure #34-108-30.0 is located 4 miles East and 1 mile South of Gardar, ND on 133rd Ave. NE. Structure #34-109-25.0 is located 5 miles East and 3 miles North of Gardar, ND on 85th St. NE. Structure #34-120-25.0 is located 3 miles West and 2 miles North of St. Thomas, ND on 145th Ave. NE. Structure #34-121-04.0 is located 3 miles East and 2 miles South of Neche, ND on 147th Ave. NE. Structure #34-123-12.0 is located 2 miles North of Hamilton, ND on 149th Ave. NE. Structure #34-125-27.0 is located 1.5 miles East of St. Thomas, ND on 145th Ave. NE. Structure #34-126-07.0 is located 4 miles East and 2 miles North of Bathgate, ND on 152nd Ave. NE. Structure #34-126-08.1 is located 4 miles East and 1 mile North of Bathgate, ND on 152nd Ave. NE. Structure #34-127-05.0 is located 5 miles West and 2 miles South of Pembina, ND on 105th St. NE. Structure #34-128-16.0 is located 4 miles East and 2 miles South of Hamilton, ND on 94th St. NE. Structure #34-128-18.0 is located 5 miles East and 3 miles North of Glasston, ND on 92nd St. NE. Key project elements include structure rehabilitation at each location. Work to be performed by Consultant includes: Preliminary Engineering: This phase shall consist of all activities necessary to complete the environmental document (including FHWA concurrence and approval), conduct public involvement, perform preliminary design, and coordinate utility location and conflict plans. The preliminary engineering phase will be considered complete upon receiving environmental approval from FHWA and NDDOT approval of all other deliverables. Design Engineering: This Phase shall consist of design activities following preliminary design and preparation of final construction plans, specifications, and estimates; execute contracts for utility conflict plans for adjustments and relocations; final right of way acquisition, final mitigation plans and permitting. Final Design will be considered complete upon delivery and approval of final construction plans, specifications, estimates, certifications, and NDDOT approval of all other deliverables.