Specifications include, but are not limited to: • Remove the existing roofs and insulation down to the deck; remove loose membrane; • flashings; remove all debris from the roof and haul away to an approved landfill.; • Inspect the existing decking and report any problems to the owner. All repairs will be as approved by owner on a time and material basis.; • Over the entire area, apply a continuous layer of R-20 roof insulation.; • Over the new insulation, apply a 60 mil, fully adhered, EPDM rubber roof system.; • At all walls and curbs, install membrane flashing. Mechanically attach the new flashing continuously along the top edge.; • Retain and work to the existing capstones.; • Apply manufacturer approved flashing systems at all pipes, drains, metal drain boxes, and other projections.; • Provide and install new coping fabricated from 24-gauge galvanized steel with PVDF (polyvinylidene fluoride) resin coating. Color to be selected by Hancock County from the manufacturer’s standard color chart.; • Provide and install new scuppers and downspout fabricated from 24-gauge galvanized steel with PVDF (polyvinylidene fluoride) resin coating. Color to be selected by Hancock County from the manufacturer’s standard color chart.; • Perform all work in strict accordance with the manufacturer’s printed specifications.; • Perform only as much work that can be made watertight that day.; • Upon completion, furnish manufacturer’s written warranty for labor and material for 20-years.