Specifications include, but are not limited to: B. Remove exposed abandoned conduit, including abandoned conduit above accessible ceiling finishes. Cut conduit flush with walls, floors, and patch surfaces. C. Remove conduit, wire, boxes, and fastening devices to avoid any interference with new installation. D. Reconnect equipment being disturbed by renovation work and required for continue service to nearest available panel. E. Disconnect or shut off service to areas where electrical work is to be removed. Remove electrical fixtures, equipment, and related switches, outlets, conduit and wiring which are not part of final project. F. Install temporary wiring and connections to maintain existing systems in service during construction. G. Perform work on energized equipment or circuits with experienced and trained personnel. H. Remove, relocate, and extend existing installations to accommodate new construction. I. Repair adjacent construction and finishes damaged during demolition and extension work. J. Remove exposed abandoned grounding and bonding components, fasteners and supports, and electrical identification components, including abandoned components above accessible ceiling finishes. Cut embedded support elements flush with walls and floors. K. Protect and retain power to existing active equipment remaining. L. Cap abandoned empty conduit at both ends.