Specifications include, but are not limited to: Project 1 (part 1) will reduce wet weather sanitary sewer surcharging in the Turkey Creek South Subdivision. Project 1 consists of all work associated to intercept Turkey Creek South Subdivision’s sanitary sewer via a new 12” gravity sanitary sewer line that will reroute sanitary sewer flows to a new proposed sanitary sewer lift station (provided by MCD and installed as part of Project 1). This lift station will be located southwest of the intersection of West 70th Place and Harrison Street near the western border of the John A. Stefek Park.; MCD has an existing 20” force main south of this new lift station, which runs parallel to the southern edge of the NIPSCO owned former Chesapeake & Ohio Railroad right-of-way between Taft Street and Madison Street, which is currently the site of a public bicycle path. Project 1 provides for a new force main to exit the new lift station and proceed south, parallel to the western border of Stefek Park, where it will intercept and be connected to MCD’s existing 20” force main.; Project 2 (part 2) will consist of all work associated to intercept the previously replaced portion of MCD’s existing 20” force main at a point approximately 1,200 feet east of Taft Street. From that point, heading east, Project 2 provides for MCD’s existing 20” force main to be removed and replaced to its source at MCD’s existing Madison Street Lift Station.