Specifications include, but are not limited to: approximately 128 S.Y. of Concrete Approach Apron Removal; 48 C.Y. of Structural Slab– On Grade; 254 S.Y. of Pavement Removal; 291 S.Y. of Remove and Replace Asphalt Surfacing; and other related work.; demolition, removal and replacement of two existing reinforced concrete trestle approach slabs, AC pavement removal and replacement, removal of AC pavement overlay off one trestle concrete deck, material testing and field coordination; 13. Securing, permitting, maintaining, and restoring a stockpile/materials staging area as necessary to complete the Work.; 14. Sawcutting; 15. Protection of Work from freezing temperatures and precipitation; 16. All labor, equipment, and materials required to temporarily bridge existing AC pavement to new concrete slab.; 17. Compaction; 18. Asphalt for tack coating; 19. Submittal of work plan(s) / schedule(s); 20. Mobilization(s) / Demobilization(s) ; 21. Third party material testing; 22. Grading outside of improved areas needed to establish drainage; 23. Repair of existing infrastructure outside of demolition limits damaged by Contractor