Specifications include, but are not limited to: 2.1 Goal/Objective 1: For the project, Vendor shall survey the existing heating system then design a conversion from steam to water. Within their proposals, Vendors should demonstrate their past experiences with converting existing heating systems, preferably from steam to water. 2.2 Goal/Objective 2: One anticipated challenge is the selection of the new boiler plant location, observing appropriate location for boiler flue exhaust. Within their proposals, Vendors should demonstrate their experience with locating boiler plants on building campuses. Vendors should provide a basic project approach for how they would address selecting a location for a new Building 3 plant, and for locating discharge of boiler flue exhaust (i.e. so as to not contaminate air intakes for Building 3). 2.3 Goal/Objective 3: Vendor shall also be responsible for designing new natural gas utility supply to the building, to serve the new boiler plant. Agency’s intent is to cause as little disruption to Capitol Complex activity or construction as possible. Within their proposals, Vendors shoul d document their experience with designing construction of new utilities on existing building campuses. 2.4 Goal/Objective 4: Vendor shall also be responsible for designing the project for bidding using the State of WV procurement procedures (incorporating AIA construction documents into the bidding documents) and then for performing construction administration services during the construction project. Within their proposals, Vendors should document their experience with designing mechanical repair construction projects using the procedures equal or similar to the State of WV’s procurement procedures, and for administering projects for which the Owner is a government entity.