Specifications include, but are not limited to: The projects consist of the construction of a parking lot off Morgantown Road for the Center Grove Soccer Field. This parking lot includes underground detention, curbs, full depth pavement, landscaping, and a ditch reroute. The reconfiguration of the circle at the Southeast side of Honey Grove. This involves removal of an existing roadway, pavement markings, sidewalk, and curb and reinstalling. Also the widening of Pennington Roadway from Morgantown Road to the East side of Hornaday Drive. This project will widen the road 8 feet to the North while constructing a roundabout, milling & LEGALS surfacing the existing roadway, and full depth pavement in the project limits. It also includes storm water improvement involving new storm structures, concrete ditches, and curb and gutter.